
Add to Cart
DIN 2391 precision standard Seamless Cold Rolled Steel Tube for mechnical purpose St37.4
Item
St37.4 Cold rolled seamless steel pipe
Application
High Precision Cold Rolled Seamless Steel Tube is used in automotive industry, and in the occasion where the high accuracy, brightness, cleanness of the tube are required.
Standard
A519, BS6323, DIN2391, EN10305, GB3639
Material
St37.4, St35, St52, E355, S355JR, 1020, 1045, 1026, 4130, 4140, 8620, 34CrMo4...
Wall Thickness
2mm~25mm
Outside Diameter
10mm~250mm
Lenght
6m,5.8m,12m or be required
Price Term
FOB,CFR,CIF
Delivery Time
Prompt delivery as products in stock.
Package
bared,bundled,wooden box packing for export standard packge
Dimension tolerance
I.D tolerance (mm) | O.D tolerance (mm) | I.D Roughness (µm) | Straightness (mm/meter) |
H7-H9 | -/+0.5% | 0.10-0.80 | 0.2-0.80 |
Chemical composition(%):
Grade | C | Si | Mn | P | S |
St37.4 | 0.17max | 0.35max | 0.35min | 0.040max | 0.040max |
Delivery Conditions
+C (BK) Hard. No final treatment after final cold rolling.
+LC (BKW) Soft. Final heat treatment is followed by a suitable drawing pass (limited reduction of area).
+SR (BKS) Stress Relieved. After final cold rolling, the tubes are stress relieved in a controlled atmosphere.
+A (GBK) Annealed. After final cold rolling, the tubes are annealed in a controlled atmosphere.
+N (NBK) Normalized. After final cold rolling, the tubes are normalized in a controlled atmosphere.
Shipment
a. length:≤5.8m loaded in 20FT Container with 25-27tons
b.length:≤11.8m loaded in 40FT Container with 25-27tons
Trade Terms: FOB / CIF / CFR
Payment Terms: LC TT
Loading Port: Shanghai port, China.
Delivery: 3-4 weeks after received deposit
What we can offer?
-We offer a wide range of steel products in a wide variety of dimensions and executions, according to the common international specifications or customize.
-Machining and heat treatment are available.
-Also, we advise you in choosing the right materials.
Quality Assurance
Below inspection will be done in the production.
(1) ray detection---RT;
(2) ultrasonic testing---UT;
(3) Magnetic Particle Testing-MT;
(4) penetration testing-PT;
(5) eddy current flaw detection-ET
Package
In standard export packing and seaworthy material with hexagon shape bundle, covered with tarpaulin, in containers or in bulk, or upon request
Payment & Delivery
1. Both T/T and L/C will be acceptable
2. Trade Terms: FOB, CIF, CFR
3. The delivery will be in 10-15 days if have stock; For customized items, the delivery will be negotiated by both parties
4. Shipping by sea freight from Shanghai Port (PRC) for Bulk orders, by airfreight or express for samples
Shanghai Unite Steel Trading Co., Ltd
We are committed to integrate engineering steel resources in china and serve the global engineering steel market. Our company has more than 15 years of experience in steel researching, production, managing and sales. And our team mostly are based on and worked in national famous steel enterprise.
In the aspect of resources and information, we have established cooperative and stronger relationship with nearly hundred enterprises, either state-owned or private owned in china.
What’s more, we have built long, deep and close business relationship with dozens of steel company, Sharing and holding equities with several steel enterprises. Because of the close cooperation with steel companies and our pioneering spirit, which can ensure us stay at the top competition, and ensure our customers get what they really want!
Q: Are you a manufacturer or merely a trader?
A: We are group of companies and owned manufacturer bases and trading company. We specialized in special steel which include alloy structural steel and carbon steel and stainless steel, etc. All material are with high quality and competitive price.
Q: How do you guarantee the quality of your product?
A: Firstly, we can provide the certificates from the third party, such as TUV, CE, if you need. Secondly, we have a complete set of inspection system and every process is checked by QC. Quality is the lifeline of enterprise survival.
Q: Delivery time?
A: We have ready stock for most of material grades in our warehouse. If the material doesn't have stock, the delivery lead time is about 5-30 days after receiving your prepayment or firm order.
Q: What is the payment term?
A: T/T or L/C.
Q: Can we visit your company and factory?
A: Yes, warmly welcome! We can book the hotel for you before you come to China and arrange our driver to our airport to pick you up when you come.